

DO NOT: Use rosin, solvents, abrasive cleaners, cola, vinegar, (concentrated) ammonia, bleach, or any product that says it will leave your floor shiny. For special non-slip requirements or treatments, call our customer support department. DO: Wash the new floor 2-3 times with lukewarm water before using. Such bending or inadvertent stepping on folded flooring can result in stretch marks or cracking, depending on the type of vinyl. Be careful not to severely bend vinyl flooring. For pricing of Stagestep installation products, including Springstep IV subfloor systems Vinyl Floor Preparation - Do’s & Don’ts DO: Make sure the smooth surface is up and foam or texture down when installing.ĭO NOT: Flip flooring edge over edge. Most wood floors require professional installation except for Stagestep’s Encore and Compass flooring systems.įor more information on installation preparation for subfloors and wood flooring systems, please see page 19. Slabs need to have a vapor barrier installed and there needs to be venting to the slab for air flow.

Wood, like vinyl, needs time to acclimate to the space. A water proofing concrete sealer, like Stagestep Bone Dry may also be used. Caution: All slabs must be covered with a vapor barrier.

No labor cost will be covered on claims based on visual defects that could have been seen prior to or during installation. Material should always be visually inspected during installation. Materials must be stored in an area that is fully enclosed and weather-tight, with a permanent HVAC system set to a uniform temperature of 68 degrees and a relative humidity of 50-70% for at least 72 hours prior to and during the installation. Shaw Laminate Flooring Installation Video. Contact your Stagestep salesperson or our customer service representative as soon as possible. Be sure the photos are clear with good lighting and no glare. If you have any questions about the condition of the flooring you have received, or if the rolls have been removed from their packaging, please take multiple photos from different angles.

Failure to do so may result in deformation of the vinyl product, for which Stagestep is not responsible. Upon receipt, all rolls of vinyl flooring should be immediately removed from this box, inspected and stood upright on a perfectly level surface or leaned again a wall in the most upright position possible. The contents shipped to you should be contained in a large box on an 8’ pallet and be wrapped in plastic shrink-wrap. Please examine the packaging for any damage which may have occurred during transit. Installation Preparation Inspection of Material Material should be delivered to the job site in its original unopened packaging with all labels intact. Installer Cube Butane Average ratng: 4,0/5 5128reviews
